What the product is

“Ferrous metals” in this article means iron, manganese, chromium and their alloys, with steel as the most important product - a usage note written by this article, since none of the registered sources defines the term. Steel is not a single homogeneous commodity: grade, strength, surface treatment and dimensions determine its use and delivery standard. Investors can trade steel futures or hold mining and steel-company shares; physical businesses buy iron ore, coking coal, scrap and energy, then organize smelting and rolling.

Rights, obligations and cash flows

Stage Cash flow Main costs Price and risk
Iron ore and coking coal mining Sales to steel mills or traders Extraction, transport, taxes Ore grade, freight, demand
Smelting and rolling Purchase inputs and energy; sell crude steel or products Iron ore, coking coal, power, carbon Processing margin, utilization, inventory
Steel futures Margin, daily mark-to-market, delivery Commissions, funding, basis Leverage, delivery standard, liquidity

The table sets out the same arrangements as flows over time; the amount column uses expressions or document terms, not market data:

Time or condition Cash flow Amount Currency Uncertainty
Purchase iron ore and coking coal Pay price, freight and taxes CIF price × quantity + freight and taxes Contract currency Grade, freight and demand move; arrival and inspection timing matter
Run smelting and rolling Pay energy, consumables and processing Per input volumes and process Pricing currency Yield and specification drive unit cost
Sell steel Receive payment Sale price × quantity − discounts Trading currency Price cycle plus credit and payment-term risk
Trade steel futures Post margin, mark to market, deliver Notional × margin rate; profit or loss = price change × multiplier Contract settlement currency Leverage, delivery standards and liquidity
Hold miner or mill equity Pay the market price, or receive declared dividends Shares × market price; dividend per share Accounting currency Operating and capital-spending risk; not a physical or contract exposure

Supply chain and participants

The blast furnace–basic oxygen furnace route relies mainly on iron ore and coking coal: ore is sintered or pelletized, coal is coked, the blast furnace reduces iron ore to hot metal, and the basic oxygen furnace converts it to steel. The electric arc furnace route relies mainly on scrap and electricity. Crude steel is continuously cast and rolled into hot-rolled coil, rebar and wire rod for construction, machinery, automobiles and appliances. Mines, coke plants, mills, traders, processors, warehouses and end users form the chain; freight, inventory and payment terms drive cash flow at each stage.

In 2025, world iron ore production was about 2.6 billion tons of usable ore containing about 1.6 billion tons of iron [1]. USGS also reports in its Events, Trends, and Issues narrative, rather than in the production table, that imported iron ore fines of 62% iron content on a CIF basis at Tianjin Port, China averaged $99.07 per ton in the first nine months of 2025, down from $112.07 in the same period of 2024 [1].

Trading, holding and exit

Steel futures can be closed or delivered. On the Shanghai Futures Exchange, the hot-rolled coil contract is 10 metric tons per lot, quoted in RMB per metric ton, with a minimum fluctuation of RMB 1 per metric ton, a minimum margin of 4% of contract value, and a 300-metric-ton delivery unit; the standard product is Q235B or SS400 coil 5.75 mm thick and 1,500 mm wide[3]. Rebar futures deliver grade HRB400E under GB 1499.2-2024, use the same 10-metric-ton lot size, carry a minimum trading margin of 5% of contract value and a 300-metric-ton delivery unit[4]. Operating businesses hedge to lock in processing margins, but basis and deliverable grade still create risk.

Costs and risks

Steel costs consist of iron ore, coking coal, scrap, power, transport and carbon. World crude steel production was about 1.849 billion tons in 2025, with 69.4% from the basic oxygen furnace route and 30.3% from electric arc furnaces; building and infrastructure accounted for about 52% of global steel use[2]. A property or infrastructure slowdown compresses demand, while trade barriers and capacity changes alter regional price spreads. Futures leverage, margin calls, delivery quality and inventory devaluation are real risks.

Terms and documents

Physical contracts cover grade, dimensions, weight, delivery location, payment and inspection. Futures contracts cover specifications, margin, last trading day, deliverable brands and warehouses. Equity holdings require attention to mineral rights, costs, output and capital spending. Iron ore from different origins differs in grade and impurities and cannot be compared by tonnage alone.

Comparison and boundaries

The blast furnace–basic oxygen furnace route depends on iron ore and coking coal, while the electric arc furnace route depends on scrap and electricity; their cost and carbon structures differ. Hot-rolled coil and rebar have different uses and delivery standards and are not interchangeable. Steel futures are not iron ore futures, and neither is a steel-company share: they represent a finished product, a raw material and corporate equity respectively.

Figure

The Steel Supply Chain: three-stage chain Inputs: Iron ore and coking coal / scrap and power; Crude steel: Continuous casting; Rolled products: Hot-rolled coil, rebar, wire rod START Inputs Iron ore and coking coal / scrap and power MECHANISM Crude steel Continuous casting CHECK Rolled products Hot-rolled coil, rebar, wire rod
Figure 1: a three-stage chain in The Steel Supply Chain — Inputs → Crude steel → Rolled products. The three stages form a judgment chain, not the only path; labels come from the article text and carry no statistics. The sample is the article argument and units are marked in the text.

Related

  • Required prerequisite: Copper and Industrial Metals (MKT-011).
  • Related reading: Copper and Industrial Metals (MKT-011), Comparing Ways to Hold Gold (MKT-009).

Figures in plain language

The three figures below check the mechanism, boundary and comparison in this article; labels come from its own sections, not new data.

The Steel Supply Chain: mechanism chain The Steel Supply Chain — three-step structure: problem, mechanism, judgment. Labels come from the article's sections, not new data. The Steel Supply Chain: mechanism chain Labels come from the article's sections; all three steps matter. Problem From iron ore, coking coal and… From iron ore, coking coal and scrap to crude steel, hot-rolle d coil and… What the product is What the product is: “Ferrous… What the product is: “Ferrous metals” in this article means iron, manganese… Costs and risks Steel costs consist of iron… Steel costs consist of iron ore, coking coal, scrap, power, transport… Reading order: test the problem, then the mechanism, then whether the judgment overreaches. If a middle step lacks evidence, later conclusions are hypotheses, not facts. Structural illustration, not a new data chart; sample is the article's own argument.
Figure 2: The Steel Supply Chain — mechanism chain: problem, mechanism, judgment. Sample: the article's own argument; units as stated in the text.
The Steel Supply Chain: boundary Separates conditions where the claim holds from those where it fails; a local example is not universal. The Steel Supply Chain: when does it hold? Check the conditions before the conclusion If conditions, definitions or samples change, recompute the conclusion Holds Steel costs consist of iron ore, coking coal, scrap, power, transport and carbon. Fails / rewrite The blast furnace–basic oxygen furnace route depends on iron ore and coking coal, while the… Boundary illustration; sample is the article's own argument; units as stated in the text.
Figure 3: The Steel Supply Chain — boundary: when the claim holds, and when it fails. Sample: the article's own argument; units as stated in the text.
The Steel Supply Chain: object, conditions and common mistakes Three rows compare the concept, its conditions and common mistakes; comparison is not equivalence and does not replace a definition. The Steel Supply Chain: object, conditions and common mistakes at a glance This article Commonly confused Object From iron ore, coking coal and… Adjacent concepts / common claims Conditions Steel costs consist of iron ore, coking… The blast furnace–basic oxygen furnace route depends on iron… Check Define first, then compare; never judge labels only Correlation is not causation; a local case is not universal Comparison illustration; sample is the article's own argument; units as stated in the text.
Figure 4: The Steel Supply Chain — comparison of object, conditions and common mistakes. Sample: the article's own argument; units as stated in the text.

Exercises

  1. Identify the route. Which steelmaking route uses scrap and electricity as its main inputs?
  2. Contract calculation. Assume hot-rolled coil costs RMB 3,500 per metric ton. Calculate the value of one 10-metric-ton contract and the 4% minimum margin.
  3. Demand conditions. Why does building and infrastructure investment have a large effect on steel demand?
Suggested answers
  1. The electric arc furnace (EAF) route.
  2. Contract value is 10 × 3,500 = RMB 35,000; minimum margin is 35,000 × 4% = RMB 1,400. This is a hypothetical price and excludes commissions and any broker margin add-on.
  3. Building and infrastructure accounted for about 52% of global steel use in 2025; changes in construction starts and investment directly affect demand for rebar, sections and flat products.

Sources

  1. U.S. Geological Survey. “Mineral Commodity Summaries 2026: Iron Ore.” https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-iron-ore.pdf (accessed 2026-11-05)
  2. World Steel Association. “World Steel in Figures 2026.” https://worldsteel.org/wp-content/uploads/World-Steel-in-Figures-2026.pdf (accessed 2026-11-05)
  3. Shanghai Futures Exchange. “SHFE Hot-Rolled Coil Futures Contract Specifications (Revised).” https://www.shfe.com.cn/products/futures/metal/ferrousandpreciousmetal/hc_f/standard_hc_f/202312/t20231205_327326.html (accessed 2026-10-30)
  4. Shanghai Futures Exchange. "Rebar Futures Contract Specifications" (rebar futures contract specifications page). https://www.shfe.com.cn/products/futures/metal/ferrousandpreciousmetal/rb_f/ (accessed 2026-11-05)

Worked demo

Read-through check: can you say three things?

No recitation needed. Tick each sentence below and see whether you can explain the mechanism, one worked example and one boundary in your own words.

Ticked 0 / 3

The numbers are teaching assumptions that show relationships, not forecasts or investment advice.